Page 15 - Panel Constructions (EN).cdr
P. 15
PANEL CONSTRUCTIONS
Panel line from the inside Trace of weld on the outside (S standard)
Weld from the inside (standard S)
Section of preliminary heaters and
filters installed in the panel duct
Lek Stryków I-st and II-nd stage filter assembly
Doors for entrance into 3 sections:
- preliminary heating section,
- I-st stage filtering section,
- II-nd stage filtering section.
KMW Engineering Sp. z o.o · PL 86-050 Solec Kujawski · ul. Powstańców 8a · fon. +48(0)52 569 8000 · kmw@kmw.pl · www.kmw.pl

