Page 15 - Panel Constructions (EN).cdr
P. 15

PANEL CONSTRUCTIONS

Panel line from the inside           Trace of weld on the outside (S standard)

Weld from the inside (standard S)

                                     Section of preliminary heaters and
                                     filters installed in the panel duct

Lek Stryków                          I-st and II-nd stage filter assembly
Doors for entrance into 3 sections:
- preliminary heating section,
- I-st stage filtering section,

- II-nd stage filtering section.

KMW Engineering Sp. z o.o · PL 86-050 Solec Kujawski · ul. Powstańców 8a · fon. +48(0)52 569 8000 · kmw@kmw.pl · www.kmw.pl
   10   11   12   13   14   15   16   17   18   19   20