Page 20 - Air Handling Units.cdr
P. 20

AIR Handling UNITS

                        EMPTY SECTION

Empty section is used to enable inspection access to internal subassemblies of central stations
(for example in a system of heat exchangers) and installation steam humidiers or other equipment.
By standard it is equipped with a door or optionally with an inspection cover on the service
side of the central station. Recommended length of the empty section used for enabling the
inspections is 600 mm.

  fon +48(0)52 569 8000                                                                             kmw.pl
19
   15   16   17   18   19   20   21   22   23   24   25